Skip to main content

Archive - Jun 12, 2013 - News Article

School ceilings need permanent fix

June 12, 2013

PAWTUCKET — The problematic plaster ceilings at Potter-Burns and Nathanael Greene elementary schools have either been removed or reinforced so students can safely get through the rest of the school year. However, the structural engineer in charge of the ceiling inspections warned school officials that permanent repairs must be a priority.

Premium Drupal Themes by Adaptivethemes